Embiggen X

Singapore maritime
Demo guide & executive summary

Roadstead

A working prototype for the two places a ship loses money in Singapore — and the paperwork that hides both.

Say this

They lose money twice on the same ship — waiting to get in, and buying fuel nobody checks. We price both from their own paperwork, and a person signs everything.

Executive summary

Everything below this line is detail. If you read nothing else, read this.

What it is

A working prototype — sixteen screens, one fictional Singapore operator, a frozen clock. Two engines genuinely compute in the browser while you present, so it is not a slideshow.

What it solves

A ship loses money twice on one visit: burning fuel to arrive early for a berth that is not free, and buying fuel nobody checks against the paperwork. A third loss sits between them — a part that misses her sailing.

Who it is for

Fleet operations managers at six fuel buyers and one marketplace. Someone measured on the ship, not on the line item.

Where it stands

Built, live and presenter-proof. A 31-step guided walkthrough drives it if you would rather not click — narration is recorded but off by default. Synthetic data throughout, disclosed on its own screen.

$13,489recoverable on a single ship's visit — short delivery plus avoidable fuel
$56,733riding on one unsigned purchase order, to save $680
$32,333burned in a week by six ships arriving early, then waiting
76 daysbetween losing the right to claim and losing the evidence
Why anyone would switch
  1. A third verdict. A result inside the test's own tolerance is called contestable, not failed — so you do not accuse a supplier on a number the standard says is arguable. Every other product gives you pass or fail.
  2. A clock on the claim. Fourteen days to claim, ninety days of samples. The clock is what actually loses the money, and nobody else counts it down.
  3. One visit, all three losses. A failed fuel certificate raises a purchase order, and that order runs against the hour she sails. No bunker tool knows about the port call; no procurement system ever read a certificate.
01The problem

One ship. One visit. Three places money leaves.

A bulk carrier calls at Singapore for about four days. In that time she is handled by three different desks who do not compare notes: operations watches the arrival, bunkering buys the fuel, procurement buys the parts. Each one does their job. The money leaks in the gaps between them.

Everything below is one real vessel in the prototype — MV Kestrel Bay — on one visit.

AT SEA AT ANCHOR ALONGSIDE SHE SAILS $8,687 Burned arriving early 36.6 h at anchor, for a berth she could have reached slowly. $4,801 Billed, never metered Delivery note: 1,450.000 t. The meter it copied: 1,442.318 t. $56,733 At risk on a signature The cheaper quote for a spare lands 74 h after she has gone. Three desks. Three systems. Nobody adds up the column.

Every figure here is computed by the prototype from the vessel's own charter, speed and paperwork. Drag the speed dial in the demo and the first one moves while you watch.

01.1The fuel

Four documents describe one delivery. Two of them disagree.

When a barge pumps fuel into a ship, four records are created by four different parties: the buyer's nomination, the barge's metering ticket, the supplier's delivery note, and the invoice. They should all say the same number.

On this delivery the meter measured 1,442.318 tonnes and the delivery note was written up as 1,450 — a round number, copied by hand. The invoice followed the note, not the meter. The gap is half a percent, which is why nobody catches it, and $4,801, which is why it matters.

Then the laboratory certificate arrives three days later and almost nobody reads it against the standard properly.

NOMINATION METER TICKET DELIVERY NOTE INVOICE 1,450.000 t 1,442.318 t 1,450.000 t 1,450.000 t 7.682 t · $4,801 · 0.53% Drawn to scale. That is the whole problem.
01.2The waiting

She races to Singapore, then sits outside doing nothing.

Fuel burn rises roughly with the cube of speed. Going one knot faster costs far more than it saves in time — and if the berth is not free when she gets there, she has bought nothing at all. She anchors and burns more fuel waiting.

Slowing down does not delay her. She berths in the same slot either way. It is close to free money, and almost nobody takes it, because nobody puts a number on the alternative.

We do not predict when the berth will be free. The slot comes from her agent and the terminal, as it does today. What we compute is what the resulting wait costs — which holds however the slot moves.

HOLD 13.8 KN SLOW TO 9.5 KN 19.4 h at sea 36.6 h at anchor, burning 28.83 t burned 28.2 h at sea 27.8 h at anchor 14.93 t burned SAME BERTH SLOT $8,687.50 saved · 13.90 t not burned · one ship, one call
01.3The order

The cheaper quote arrives after she has gone.

Her chief engineer needs a fuel-pump plunger set — because the last fuel delivery came back with cat fines near the limit, and cat fines are what destroy fuel pumps. Two suppliers quoted. Every procurement system in the world ranks those two quotes by price.

SHE SAILS · 94 H TANJONG FUEL SUPPLY PULAU BUNKERING 6 h to spare $8,640 $7,960 $680 cheaper $56,733 to hold her alongside for it

Both bars are on the same scale. The saving is 1.2 % of the exposure. This is the screen that makes a fleet-operations manager sit forward, because it is the only one that speaks in their currency — the ship, not the line item.

$13,489
Recoverable on this one visit — the short delivery plus the avoidable fuel. Before you count the part.
$11,593
Billed but never metered across the ten deliveries in the demo. One month, one fictional operator.
$32,333
Fuel burned this week by six ships arriving somewhere early, then waiting.